Aker solution Lingshui project
PROJECT MANAGEMENT, DESIGN ENGINEERING & EQUIPMENT
PROJECT MANAGEMENT, DESIGN ENGINEERING & EQUIPMENT
CLIENT AKER SOLUTIONS
VESSEL AKER CONNECTOR / HAI YANG SHI YOU 286
PASSER-LARS were awarded a dual service contract with Aker Solutions for the COOEC Lingshui Project.
PASSER-LARS were awarded one contract for provision of a 2000Te Carousel and HPU, and the second contract for provision of a full equipment operating team for umbilical transpooling operations from the Aker Connector vessel to COOEC HYSY 286 installation vessel in Shenzen, China.
PASSER-LARS were responsible for engineering and project management involved with transporting the equipment from Europe to China, and modifying the carousel to suit project specific requirements.